Title: Gerenciamento de projetos de mapeamento de processos : definição de padrões de qualidade e seu impacto em prazos
Authors: Pereira, Mariana Mello
Cunha, Yanne Souza Alves
Barbalho, Sanderson César Macêdo
Vasconcelos, Rudgere Gomes
metadata.dc.contributor.email: sandersoncesar@unb.br
Assunto:: Gerenciamento de projetos
Modelagem de processos
Padronização
Estudo de caso
Issue Date: Nov-2016
Publisher: SINGEP
Citation: PEREIRA, Mariana Mello et al. Gerenciamento de projetos de mapeamento de processos: definição de padrões de qualidade e seu impacto em prazos. In: SIMPÓSIO INTERNACIONAL DE GESTÃO DE PROJETOS, INOVAÇÃO E SUSTENTABILIDADE, 5., 2016, São Paulo. Anais [...]. São Paulo: SINGEP, 2016. Disponível em: http://singep.submissao.com.br/5singep/resultado/an_resumo.asp?cod_trabalho=283.
Abstract: A aplicação de técnicas de gerenciamento de projetos (GP) é uma prática voltada para ganhos em escopo e qualidade e diminuição dos custos e prazos das operações realizadas por meio de projetos. De maneira a analisar práticas de GP quanto a seus impactos nos projetos, foi realizado um estudo de caso que analisa o método de padronização de trabalho e seu impacto em prazos em um projeto de mapeamento dos processos de uma organização pública de grande porte. O estudo apresenta a Sistemática de Mapeamento de Processos (SMP) desenvolvida para garantir o padrão de qualidade dos mapas de processo, suas respectivas versões, melhorias e seus impactos no lead time dos processos. Foi realizada uma análise das diferentes versões da sistemática, além da verificação da relação entre a quantidade, o tipo de padrão desenvolvido e a média de duração do mapeamento dos processos. Os dados sugerem que os padrões gerencias não impactam significativamente nos prazos, porém a construção de padrões para os diagramas de processos e para os padrões de controle digital geram impacto.
Abstract: The application of project management (GP) techniques is a focused practice to gains in scope and quality and decrease the cost and time of the transactions carried out through projects. In order to analyze GP practices as to their impact on projects, it conducted a case study that examines the work of standardization method and its impact on time of a modeling process project of a large public organization. The study presents a Process Modeling Systematic (SMP) developed to ensure the quality standard of process maps, their respective versions, improvements and their impact on the lead time of the processes. An analysis of different versions of the system was carried out, in addition to checking the relationship between the amount, the standard type developed and the lead time of the process modeling. The data suggest that managerial standards do not affect significantly the deadlines, but the construction standards for diagrams of processes and the digital control standards generate impact.
metadata.dc.description.unidade: Faculdade de Tecnologia (FT)
Departamento de Engenharia de Produção (FT EPR)
Licença:: Autorização concedida à Biblioteca Central pelo Professor Sanderson César Barbalho para disponibilizar esta obra gratuitamente, de acordo com as permissões aqui assinaladas, para fins de leitura, impressão e download, com objetivo de divulgação acadêmica e científica da produção intelectual do autor. A obra permanece protegida pela legislação de direitos autorais e demais normas aplicáveis. Qualquer utilização não autorizada por esta licença ou pela legislação vigente é expressamente proibida.
Appears in Collections:Trabalhos apresentados em evento

Show full item record " class="statisticsLink btn btn-primary" href="/handle/10482/57329/statistics">



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.